Capacity
51,360 acre feet
Surface area
Over 1,000 acres
North Dam (rockfilled with a clay core)
Height: 97 feet
Length: 3,000 feet
West Dam (rockfilled with a clay core)
Height: 57 feet
Length: 7,500 feet
Project Cost
$31,264,919
Pipeline
Length: 4.7 miles
Size: 60-inch
Capacity: 120 cubic feet per second
Recharge (seepage and infiltration)
4,500 to 11,000 acre-feet of water into the Navajo Sandstone Aquifer annually
Aquifer storage capacity 300,000 acre-feet
Engineers
Rollins, Brown & Gunnell and Alpha Engineering
The Sand Hollow Reservoir began filling on April 8, 2002.
The reservoir was dedicated on April 18, 2003.