Pipeline
Length: 17.4 mile
Type: 30” steel from Gunlock to Ivins Reservoir
Type: 28” HDPE from Ivins Reservoir to Santa Clara
Project Cost
Total Cost: $6,335,097.38
Project Timeline
2004 – construction began
2004 – construction completed
Project Engineers
Alpha Engineering
Benefits of the Project
|
The Gunlock to Santa Clara pipeline was dedicated on October 13, 2004. |